.
I was at the job site this morning -- the excavation crew was hard at work preparing the base for the heel slab and the key-way for the retaining wall which makes a major portion of the support system for the pool that would be accessible from the patio at the back of the house and the deck that overlooks the Golf Course below
I talked to Andy, Jim and Roberto at the job site and Andy mentioned the plans are to complete the excavation and installation of the rebars for the heel slab by tomorrow and place concrete in the heel slab on Friday, Apr-11-2014
No comments:
Post a Comment