Thursday, August 8, 2019

Readiness For Concrete Placement In ICF Basement Walls of House In SouthEastern Michigan -- ANAND Enterprises project VieJ1J1801(LinC1J1902)

.
Inspection For
Readiness For Concrete Placement In ICF Basement Walls of House 

The walls have been formed, rebars have been installedand the walls have been braced and aligned. Attachments for TJI supports have been installed for embedding into concrete, beam pockets have been prepared. The walls are ready for concrete placement.



















Wednesday, August 7, 2019

Readiness For Concrete Placement In Footings For Deck Posts In SouthEastern Michigan -- ANAND Enterprises Project CreB1J1903

.
Readiness For Concrete Pour In Deck Footings                 

The four footings have been dug. The two footings nest to the house have dowels installed into the house footings. Each of the four footings is to receive (4) #4 vertical bars (1) at each corner to be installed at the time of concrete pour.