Monday, March 11, 2024

RollUp Door Installation -- Illustrative Video In Industrial Building -- ANAND Enterprises Project HymB1J2301 in SouthEastern MI

This Video Is For Installation Of RollUp Door

Illustration Of A Typical Door

YOU Must Follow Specific Instructions Furnished By Your Specific Door Supplier



Thursday, January 4, 2024

Reviewing Structural Integrity of Existing Walls For Second Story Addition To House In SouthEastern Michigan -- ANAND Enterprises Project LinR1J2401

I visited the project site today to look at the structural condition of the existing structure for the proposed second story addition.

My walk down inspection of the interior and the exterior of the house indicated that the existing walls can safely support the addition of the second floor to the house.

In the following I present some of the pictures I took during my walk down inspection. If anything unusual is encountered when things are opened up in the field, the Project Manager will be notified promptly who will contact the Architect/Engineer for handling the situation in a satisfactory manner.