Readiness For Concrete Placement In Footings For Deck Posts In SouthEastern Michigan -- ANAND Enterprises Project CreB1J1903

.
Readiness For Concrete Pour In Deck Footings                 

The four footings have been dug. The two footings nest to the house have dowels installed into the house footings. Each of the four footings is to receive (4) #4 vertical bars (1) at each corner to be installed at the time of concrete pour.