.
Inspection For
Readiness For Concrete Placement In ICF Basement Walls of House
The walls have been formed, rebars have been installedand the walls have been braced and aligned. Attachments for TJI supports have been installed for embedding into concrete, beam pockets have been prepared. The walls are ready for concrete placement.
No comments:
Post a Comment