Thursday, January 7, 2021

Readiness For Concrete Placement In Paint Air Plenum Pit Base Slab In SouthEastern Michigan -- ANAND Enterprises Project AyoB1J2021

 I was at the job site to look at the readiness for concrete placement in the base slab. In the following I present some pictures that I took during my field visit.

Vapor barrier had been installed,  rebars for the peripheral and interior walls were in place, welded wire fabric for the base slab is in place -- the base slab is ready for concrete placement.