.
Readiness For Concrete Pour In Deck Footings
| | | | | | | | | | | | | | | | | |
The four footings have been dug. The two footings nest to the house have dowels installed into the house footings. Each of the four footings is to receive (4) #4 vertical bars (1) at each corner to be installed at the time of concrete pour.
No comments:
Post a Comment