.
I was at the job site this morning to witness concrete placement in basement ICF walls. Concrete was pumped with pump from Briskey Brothers, ready-mix concrete was supplied by Doan Concrete. It was team work by Matt Lincoln and his crew, the Briskey Brothers pump operator, and Doan Concrete driver. In the following I present some pictures that I took during my inspection.
t ICF walls
No comments:
Post a Comment