.
I was at the project site on Apr-05-2019 afternoon to look at the installation of structural steel and metal deck for blocking the grated openings in the floor -- structural work has been done in a workman like manner and is ready for installation of Floor Drain and concrete to block the openings.
In the following I have presented some pictures that I took during my field visit